Project Watch

N940AC Project Watch

June 8, 2017
N940AC Project Watch Update for Week of June 4, 2017

This week we installed the left MLG assembly (awaiting clevis pins to return from NDT) and replaced the right elevator flex cable.  Avionics has most of the harness’s fabricated  and are working on routing and termination of wiring in aircraft.

 

LEFT MAIN LANDING GEAR

RIGHT ELEVATOR FLEX CABLE

AVIONICS INSTALL

AVIONICS INSTALL

AVIONICS INSTALL

 