Project Watch

N940AC Project Watch

June 30, 2017
N940AC Project Watch Update for Week of June 25, 2017

New avionics wiring installation nearly completed, connectors terminated and assembled.  In the process of performing wire continuity checks.  Environmental system installation in work.  Heat exchanger installed, plumbing between valves and valves mounted.  Removed section of the vertical, waiting for engineering to formulate a repair for the damaged areas.

WIRING RING OUT CHECKS

PANEL FIT

HEAT EXCHANGER INSTALLED

ECS INSTALLATION

HEAT EXCHANGER

SECTION REMOVED; WAITING FOR ENGINEERING REPAIR

 