Project Watch

N940AC Project Watch

August 11, 2017
N940AC Project Watch Update For Week of August 6, 2017

This week we finished installation of insulation bags in cabin; still need to work on installing Nomex blanket.  Both wing outboard de-ice boots have been installed.  Fuel leaks have been repaired, aircraft fueled and leak checked good.  Installed original Dowty props for ferry flight to paint.  Performed first engine runs and working through ops checks.  Worked on close up of inspection panels.  In process of troubleshooting stall warning, performing ops checks on Enviro system, ops checks and installation of avionics equipment, and prepping aircraft for ferry flight to paint.

RIGHT WING DEICE BOOT

CABIN INSULATION SYSTEM

 

Project Watch

Sort by Aircraft