This past week we fabricated the pressure duct that goes over the floor, fabricated pulley brackets, received most of the extrusion and metal ordered and rings for the tub are being machined by an outside vendor.  Getting ready to start locating pulley brackets in the aircraft.

 

CAMERA HOLE CUTOUT

PRESSURE DUCT

PRESSURE DUCT

PULLEY BRACKETS

PULLEY BRACKETS

EXTRUSION

 