N73EF Project Watch Update for Week of March 26, 2017

Attached are some pictures of the lower fairing and door assembly.  The defog ring assembly is being welded this week along with the forward lower fairing closeout.  We have the cables out and are sending them to have new ones made this week.

LOWER FAIRING FORWARD CLOSEOUT

CONTROL CABLES

DEFOG RING

LEFT FAIRING AND DOOR

FAIRING ASSEMBLY AND DOOR

RIGHT FAIRING

 