Project Watch

N73EF Project Watch

January 20, 2017
N73EF Project Watch Update for Week of January 15, 2017

This week we have taken the cabin windows out and started to clean and reseal them for install.  We have received some frame parts to build the aft camera port structure. The last shipment of sheet metal has arrived and we are currently getting ready to cut and locate the bottom doubler.  Once the doubler is located we can start to assemble the internal webs surrounding the camera port.

CABIN DOOR WINDOW REMOVAL

CABIN WINDOW REMOVAL

CABIN WINDOWN REMOVAL

FRAME STRUCTURE PARTS

SHEET METAL

 