N73EF Project Watch Update for Week of April 9, 2017

We have the hydraulic lines in and leak checked.  The control cables are in and getting rigged.  The door assembly is in with the motor and switches and ops checked.  Rad/Alt antenna doublers are being installed.  Aircraft is being prepped for paint.  Floors are going down this weekend.