Project Watch

N940AC Project Watch

August 18, 2017
N940AC Project Watch Update for Week of August 13, 2017

This week avionics panel and equipment installed, aircraft access panels closed up, engine runs and leak checks completed.  Prepped aircraft for ferry flight to paint.

INSTRUMENT PANEL

INSTRUMENT PANEL

AIRCRAFT PREPPED FOR TRIP TO PAINT.

AIRCRAFT PREPPED FOR TRIP TO PAINT.

AIRCRAFT PREPPED FOR TRIP TO PAINT.

 

Project Watch

Sort by Aircraft